24 November 2010

Main Outside Studio Building Works



Work is on going on the front of the studio as 20 years of weather have taken the toll. New windows, fascia board and blasting what was left of the painted surface is taking place. Underneath beautiful stone, light grey from Trawsfynydd and pointing in good condition. Today top coat of Atlantic Surf 1 put onto the two main doors. The colour is actually a hybrid mixed by Robinsons Bangor, a never to repeated blue.